AIP Supplement
2020
AIP SUP Current Checklist 2020 339.2 Kb
AIP SUP 08 2020 Exchange Rate calculation for Aeronautical charges 396.6 Kb
AIP SUP 07 2020 Opening of AIM AD unit Terminal III 333.3 Kb
AIP SUP 06 2020 HTIR RFFS upgraded to CAT 5 333.3 Kb
AIP SUP 05 2020 HTNA AD closed due rehabitation WIP 333.3 Kb
AIP SUP 04 2020 AR 391 KHz NDB temporarily withdrawn 330.2 Kb
AIP SUP 03 2020 MZ 403 KHz NDB temporarily withdrawn 330.2 Kb
AIP SUP 02 2020 Licenced Aerodromes 379.7 Kb
2019
AIP SUP 06 2019 Mchauru Airport 447 Kb
AIP SUP 03 2019 Tanzania AIM Publication Charges 352.7 Kb
AIRAC AIP SUP 21 2019 Establishment of Mwanza TMA 919.5 Kb
AIP SUP 04 2019 HTMT RWY Extension and Rehabilitation WIP 1.7 Mb
AIP SUP 24 2019 HTAR Parallel TWY construction, Renovation of TWY C and Remote Apron expansion & upgrade 773.7 Kb
AIRAC AIP SUP 25 2019 Strategic Lateral Offset Procedure (SLOP) in DAR FIR 430.3 Kb
AIP SUP 29 2019 Certificated Aerodromes 305.1 Kb
2017
AIRAC AIP SUP 17 2017 VFR Operating Procedures within DAR TMA 1.1 Mb
2016
AIP SUP 15 - 16 2016 291.8 Kb
AIP SUP 04 2016 HTZA RNAV GNSS APCH Procedure RWY 18 517.5 Kb
2015
AIP SUP 16 - 18 2015 Various Aerodromes 390.7 Kb
AIP SUP 7 - 9 2015 Various Aerodromes 311.1 Kb
2014
AIP SUP 02 2014 Songwe GNSS Approach Procedures 7.1 Mb
AIP SUP 04 2014 Mwanza GNSS Approach Procedures 1.1 Mb
2013
AIP SUP 11 2013 North Mara rock dumping site 612.9 Kb
2010
AIP sup 20 2010 New instrument approach procedures 861.6 Kb
2007
AIP SUP 13 2007 AD owned by TANAPA 354.4 Kb
2006
AIP SUP 15 2006 HTUR RWY rough surafce 350.8 Kb